en

DOMESTIC WASTEWATER TREAT. PLANT SBREM 450 D3

0PK00501
Add to Wishlist
70.975 €
Description
Domestic Wastewater treatment plant type ACO SBREM 450 D3 by means of a Sequential Biological Reactor (SBR) manufactured at glass-reinforced plastic (GRP), in horizontal format for underground installation. With treatment capacity for 450 users and a hydraulic demand of 67,5 m³/day, with high purification performance in compliance with RD 509/1996. Solution consisting of 2 equipment, a first decanter of dimensions 10800mm in lenght, 3000mm in width and 3137mm in height. With inlet and outlet connection DN250 and with 2 access covers inside the equipment the dimensions Ø567 realised at polyethylene. Followed by a reactor the dimensions 10800mm in lenght, 3000mm in width and 3250mm in height. With inlet and outlet connection DN250 and with 2 access covers inside the equipament de dimensions Ø567 realised at polyethylene. Total installed power: 9,5kW. Weight: 2545kg.
Code:0PK00501
Characteristics
The position of the pump avoids the outflow of possible floats
  • Benefits
  • Compact water treatment plant
  • Easy installation and maintenance
  • Low power consumption
  • No recirculation is required to keep the biomass in the reactor or even for the nitrification-denitrification process
Areas of application
  • Equipment for the treatment of domestic wastewater by oxidation in small and medium-sized communities
Decanter
  • Anaerobic degradation of the accumulated organic matter
  • Includes flow regulating pump
Reactor
  • Removal of organic matter and nutrients
  • Including recirculation system by pump
  • Includes turbine type compresor for 1-3mm bubbles
Electrical panel and PLC
  • Three-phase current 400 V
  • IP - 44 protection
  • Installed power 9,5 kW
Effluent qualities
  • BOD5 (mg/l)<15
  • COD (mg/l)<61
  • SS (mg/l)<15
Effluent qualities
  • BOD5 (%) = 92
  • COD (%) = 90
  • SS (%) = 94
  • The equipment is designed to treat waste water with the following composition: BOD5: 400ppm, COD: 600ppm, SS: 450ppm
Operation
  • The system is carried out in the following stages:
    1 - Primary settling tank: sedimentation and settling of the influent. The water is pumped to the reactor in a programmed way at the beginning of a cycle. Its operation is not affected by the hourly discontinuity of the influent flow. It decants part of the solids and also anaerobically degrades the accumulated organic matter.
    2 - Biological clarifier reactor: The treatment sequences are as follows:
  • Filling: reception of a certain volume of water from the primary settling tank by pumping.
  • Reactor: in the reaction stage, aerobic phases (presence of oxygen) are combined with anoxic phases (without oxygen) which allows the removal of organic matter and nutrients.
  • Sedimentation: during this phase and in the absence of agitation and aeration, the sludge settles, leaving the sludge at the bottom and the clarified at the top.
  • Emptying: the treated water is pumped out.
Technical Specifications
Esquema SBREM HE 2 EQUIPOS
Dimensions 1
Model:
SBREM 450
EH:
450
Flow rate (m³/day):
67,5
Weight (kg):
2545
Dimensions 2
L
(mm):
10800
L1 (mm):
10800
A (mm):
3000
H (mm):
3137
H1 (mm):
2730
H2 (mm):
2630
H3 (mm):
3250
H4 (mm):
2680
H5 (mm):
2680
TD (mm):
407
TD2 (mm):
457
DN:
250
DN2:
63
DN3:
63

ACO. we care for water